Looking after your PLC

03 September 2024

TOM CASH explains how engineers can ensure PLCs last for their expected duration.

PLCs CAN survive for over 20 years; although the component parts of a PLC, such as central processing units (CPUs) and power supply units (PSUs), boast long lifespans, components such as input/output (I/O) modules and communication modules are not so robust. In fact, about 80% of PLC failures result from field devices, I/O module failure or power supply issues.

The checklist

To maintain your PLC effectively, start by regularly backing up its code base to ensure quick recovery if you need to reset or replace the PLC entirely.

Routinely inspect connections like plugs, sockets and terminals, ensuring that they are secure, particularly in high-vibration areas where fasteners like screws and bolts may loosen.

If your system has LED indicators as well, monitor these regularly for insight into the PLC's status. For example, check the status of the battery indicator to confirm it provides sufficient backup power for the PLC’s erasable programmable read only memory (EPROM) in the event of a power failure.

If your PLC system connects to sensors, ensure they are maintained according to the manufacturer's recommendations. When doing so, examine local wiring to identify any potential sources of electromagnetic interference (EMI) and ensure lower-level components are positioned away from high-current lines to minimise interference.

Plus, don’t forget to include calibration of input and output devices, as well as circuit cards, in your preventive maintenance program for accurate performance. Be prepared to replace worn input or output modules, following proper instructions and safety precautions.

Computerised maintenance management system

The frequency of preventive maintenance for a PLC is primarily determined by its application and operational environment. In harsh conditions, such as extreme temperatures or humid environments, maintenance activities may need to be performed more frequently.

For instance, in manufacturing environments with heavy machinery, vibrations and airborne particles can accelerate wear on PLC components, necessitating regular inspections and maintenance.

Daily maintenance tasks, like dusting the PLC and clearing the vents to prevent debris accumulation that could lead to overheating or malfunctions, are simple yet effective actions that enhance a system’s performance and longevity.

Conversely, certain tasks that are less influenced by the working environment, like backing up the PLC’s programming, can typically be scheduled every six months, ensuring a current copy is available in case of failure.

Remember, these maintenance activities should be planned based on the passage of time and the amount of usage because both factors impact when maintenance should be performed.

Using a computerised maintenance management system (CMMS) streamlines this process, enabling the tracking of historical data, like when specific components tend to fail or require replacement.

For example, if historical data shows that a particular component generally fails every eight to nine months, scheduling its replacement every six months can help avoid unexpected breakdowns.

This, coupled with keeping an up-to-date inventory of spare parts and performing routine audits of PLC systems, allows for proactive maintenance and guarantees that critical components are readily available for quick replacements.

Tom Cash is director of Foxmere

foxmere.com

 